Sunday, February 20, 2022
New Interior
Now that the major work is done, we still have a few minor things to do, but these should be easy tasks. With my son's help, it should go pretty fast. I'll only need to plan out the money.
Wednesday, November 10, 2021
Time for Upholstery
Well, now I'm getting even closer to finishing up this project. With the new carpet installed, it's time to get the seats recovered and have custom door panels made with matching material.
These are the seats that are in the car now. They are a blue velour. But I want something different. I thought about Vinal, because it would be easy to clean. However, I think that looks a bit cheap. So, I decided to go with a two-tone material of white and gray.
Here is a picture of the color scheme that I will try to replicate in my 73. My seats will be a bit different, but the colors will be as close as I can match them.
When I get them done, I'll post a new set of pictures.
Sunday, October 17, 2021
Installed Stock Muffler
After a few hours of work struggling to install the muffler, I finally got it done. Praise the Lord!
New Back Seat Kick Panels
New Carpet
I finally got the new carpet installed. I was a little nervous about doing this, because I've never worked with carpet. So, I took it slow and got it done. It turned out pretty good.
Friday, September 10, 2021
Carpet Prep - Rusty Floor Panels
OK, it's now time to tackle the interior, starting with prep work. I used a wire wheel to knock off the accessible rust under the passenger side floor pan, then I painted on a rust converter (see below).
After the rust is fixed on all the floor pans, I'll lay down some nice sound barrier rubber to make the car a little less noisy. Then comes the carpet. Yippee!
I'll include a before and after rust shots, then later, I'll add more posts to show the progress. These two photos show a before and after for the rust treatment. The dirty yellow is old carpet glue that will be covered up with the new carpet coming.